ID Task Name Duration Start Finish Predecessors

1 Scope 3.5 days Mon 1/3/00 Thu 1/6/00

2 Determine project scope 4 hrs Mon 1/3/00 Mon 1/3/00

3 Secure project sponsorship 1 day Mon 1/3/00 Tue 1/4/00 2

4 Define preliminary resources 1 day Tue 1/4/00 Wed 1/5/00 3

5 Secure core resources 1 day Wed 1/5/00 Thu 1/6/00 4

6 Scope complete 0 days Thu 1/6/00 Thu 1/6/00 5

7 Analysis/Software Requirements

14 days Thu 1/6/00 Wed 1/26/00

8 Conduct needs analysis 5 days Thu 1/6/00 Thu 1/13/00 6

9 Draft preliminary software specifications3 days Thu 1/13/00 Tue 1/18/00 8

10 Develop preliminary budget 2 days Tue 1/18/00 Thu 1/20/00 9

11 Review software specifications/budget with team4 hrs Thu 1/20/00 Thu 1/20/00 10

12 Incorporate feedback on software specifications1 day Fri 1/21/00 Fri 1/21/00 11

13 Develop delivery timeline 1 day Mon 1/24/00 Mon 1/24/00 12

14 Obtain approvals to proceed (concept, timeline, budget)4 hrs Tue 1/25/00 Tue 1/25/00 13

15 Secure required resources 1 day Tue 1/25/00 Wed 1/26/00 14

16 Analysis complete 0 days Wed 1/26/00 Wed 1/26/00 15

17 Design 14.5 days Wed 1/26/00 Tue 2/15/00

18 Review preliminary software specifications2 days Wed 1/26/00 Fri 1/28/00 16

19 Develop functional specifications 5 days Fri 1/28/00 Fri 2/4/00 18

20 Develop prototype based on functional specifications4 days Fri 2/4/00 Thu 2/10/00 19

21 Review functional specifications 2 days Thu 2/10/00 Mon 2/14/00 20

22 Incorporate feedback into functional specifications1 day Mon 2/14/00 Tue 2/15/00 21

23 Obtain approval to proceed 4 hrs Tue 2/15/00 Tue 2/15/00 22

24 Design complete 0 days Tue 2/15/00 Tue 2/15/00 23

25 Development 21.75 days Wed 2/16/00 Thu 3/16/00

26 Review functional specifications 1 day Wed 2/16/00 Wed 2/16/00 24

27 Identify modular/tiered design parameters1 day Thu 2/17/00 Thu 2/17/00 26

28 Assign development staff 1 day Fri 2/18/00 Fri 2/18/00 27

29 Develop code 15 days Mon 2/21/00 Fri 3/10/00 28

30 Developer testing (primary debugging)15 days Thu 2/24/00 Thu 3/16/00 29FS-75%

31 Development complete 0 days Thu 3/16/00 Thu 3/16/00 30

32 Testing 48.75 days Wed 2/16/00 Mon 4/24/00

Management

Management

Project Manager

Project Manager

1/6

Analyst

Analyst

Project Manager

Project Manager,Analyst

Analyst

Project Manager

Management,Project Manager

Project Manager

1/26

Analyst

Analyst

Analyst

S M T W T F S S M T W T F S S M T W Jan 2, ’00 Jan 9, ’00 Jan 16, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 1

Project: Software Development Date: Thu 5/25/17

ID Task Name Duration Start Finish Predecessors

33 Develop unit test plans using product specifications4 days Wed 2/16/00 Mon 2/21/00 24

34 Develop integration test plans using product specifications4 days Wed 2/16/00 Mon 2/21/00 24

35 Unit Testing 15 days Thu 3/16/00 Thu 4/6/00

36 Review modular code 5 days Thu 3/16/00 Thu 3/23/00 33,31

37 Test component modules to product specifications2 days Thu 3/23/00 Mon 3/27/00 31,36

38 Identify anomalies to product specifications3 days Mon 3/27/00 Thu 3/30/00 37

39 Modify code 3 days Thu 3/30/00 Tue 4/4/00 38

40 Re-test modified code 2 days Tue 4/4/00 Thu 4/6/00 39

41 Unit testing complete 0 days Thu 4/6/00 Thu 4/6/00 40

42 Integration Testing 12 days Thu 4/6/00 Mon 4/24/00

43 Test module integration 5 days Thu 4/6/00 Thu 4/13/00 41

44 Identify anomalies to specifications 2 days Thu 4/13/00 Mon 4/17/00 43

45 Modify code 3 days Mon 4/17/00 Thu 4/20/00 44

46 Re-test modified code 2 days Thu 4/20/00 Mon 4/24/00 45

47 Integration testing complete 0 days Mon 4/24/00 Mon 4/24/00 46

48 Training 45.75 days Wed 2/16/00 Wed 4/19/00

49 Develop training specifications for end users3 days Wed 2/16/00 Fri 2/18/00 24

50 Develop training specifications for helpdesk support staff3 days Wed 2/16/00 Fri 2/18/00 24

51 Identify training delivery methodology (computer based training, classroom, etc.)2 days Wed 2/16/00 Thu 2/17/00 24

52 Develop training materials 3 wks Thu 3/16/00 Thu 4/6/00 49,31,50,51

53 Conduct training usability study 4 days Thu 4/6/00 Wed 4/12/00 52

54 Finalize training materials 3 days Wed 4/12/00 Mon 4/17/00 53

55 Develop training delivery mechanism 2 days Mon 4/17/00 Wed 4/19/00 54

56 Training materials complete 0 days Wed 4/19/00 Wed 4/19/00 55

57 Documentation 30.5 days Wed 2/16/00 Wed 3/29/00

58 Develop Help specification 1 day Wed 2/16/00 Wed 2/16/00 24

59 Develop Help system 3 wks Wed 3/1/00 Wed 3/22/00 58,29FS-50%

60 Review Help documentation 3 days Wed 3/22/00 Mon 3/27/00 59

61 Incorporate Help documentation feedback2 days Mon 3/27/00 Wed 3/29/00 60

62 Develop user manuals specifications 2 days Wed 2/16/00 Thu 2/17/00 24

63 Develop user manuals 3 wks Wed 3/1/00 Wed 3/22/00 62,29FS-50%

64 Review all user documentation 2 days Wed 3/22/00 Fri 3/24/00 63

65 Incorporate user documentation feedback2 days Fri 3/24/00 Tue 3/28/00 64

S M T W T F S S M T W T F S S M T W Jan 2, ’00 Jan 9, ’00 Jan 16, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 2

Project: Software Development Date: Thu 5/25/17

ID Task Name Duration Start Finish Predecessors

66 Documentation complete 0 days Wed 3/29/00 Wed 3/29/00 65,61

67 Pilot 70.25 days Wed 1/26/00 Wed 5/3/00

68 Identify test group 1 day Wed 1/26/00 Thu 1/27/00 16

69 Develop software delivery mechanism 1 day Thu 1/27/00 Fri 1/28/00 68

70 Install/deploy software 1 day Mon 4/24/00 Tue 4/25/00 47,69,66,56

71 Obtain user feedback 1 wk Tue 4/25/00 Tue 5/2/00 70

72 Evaluate testing information 1 day Tue 5/2/00 Wed 5/3/00 71

73 Pilot complete 0 days Wed 5/3/00 Wed 5/3/00 72

74 Deployment 5 days Wed 5/3/00 Wed 5/10/00

75 Determine final deployment strategy 1 day Wed 5/3/00 Thu 5/4/00 73

76 Develop deployment methodology 1 day Thu 5/4/00 Fri 5/5/00 75

77 Secure deployment resources 1 day Fri 5/5/00 Mon 5/8/00 76

78 Train support staff 1 day Mon 5/8/00 Tue 5/9/00 77

79 Deploy software 1 day Tue 5/9/00 Wed 5/10/00 78

80 Deployment complete 0 days Wed 5/10/00 Wed 5/10/00 79

81 Post Implementation Review 3 days Wed 5/10/00 Mon 5/15/00

82 Document lessons learned 1 day Wed 5/10/00 Thu 5/11/00 80

83 Distribute to team members 1 day Thu 5/11/00 Fri 5/12/00 82

84 Create software maintenance team 1 day Fri 5/12/00 Mon 5/15/00 83

85 Post implementation review complete 0 days Mon 5/15/00 Mon 5/15/00 84

86 Software development template complete 0 days Mon 5/15/00 Mon 5/15/00 85

Project Manager

S M T W T F S S M T W T F S S M T W Jan 2, ’00 Jan 9, ’00 Jan 16, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 3

Project: Software Development Date: Thu 5/25/17

Management

Management

Project Manager

Project Manager

1/6

Analyst

Analyst

Project Manager

Project Manager,Analyst

Analyst

Project Manager

Management,Project Manager

Project Manager

1/26

Analyst

Analyst

Analyst

Management

Management

Management,Project Manager

2/15

Developer

Developer

Developer

Developer

Developer

3/16

W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T Jan 16, ’00 Jan 23, ’00 Jan 30, ’00 Feb 6, ’00 Feb 13, ’00 Feb 20, ’00 Feb 27, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 4

Project: Software Development Date: Thu 5/25/17

Testers

Testers

Testers

Testers

Testers

Testers

Testers

4/6

Testers

Trainers

Trainers

Trainers

Trainers

Trainers

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T Jan 16, ’00 Jan 23, ’00 Jan 30, ’00 Feb 6, ’00 Feb 13, ’00 Feb 20, ’00 Feb 27, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 5

Project: Software Development Date: Thu 5/25/17

3/29

Project Manager

W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T Jan 16, ’00 Jan 23, ’00 Jan 30, ’00 Feb 6, ’00 Feb 13, ’00 Feb 20, ’00 Feb 27, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 6

Project: Software Development Date: Thu 5/25/17

Project Manager

Project Manager,Analyst

Analyst

Project Manager

Management,Project Manager

Project Manager

1/26

Analyst

Analyst

Analyst

Management

Management

Management,Project Manager

2/15

Developer

Developer

Developer

Developer

Developer

3/16

T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M Feb 27, ’00 Mar 5, ’00 Mar 12, ’00 Mar 19, ’00 Mar 26, ’00 Apr 2, ’00 Apr 9, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 7

Project: Software Development Date: Thu 5/25/17

Testers

Testers

Testers

Testers

Testers

Testers

Testers

4/6

Testers

Testers

Testers

Testers

4/24

Trainers

Trainers

Trainers

Trainers

Trainers

Trainers

Trainers

4/19

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M Feb 27, ’00 Mar 5, ’00 Mar 12, ’00 Mar 19, ’00 Mar 26, ’00 Apr 2, ’00 Apr 9, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 8

Project: Software Development Date: Thu 5/25/17

3/29

Project Manager

Deployment Team

Deployment Team

Deployment Team

5/3

Deployment Team

Deployment Team

Deployment Team

Deployment Team

Deployment Team

5/10

Project Manager

Project Manager

Project Manager

5/15

5/15

T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M Feb 27, ’00 Mar 5, ’00 Mar 12, ’00 Mar 19, ’00 Mar 26, ’00 Apr 2, ’00 Apr 9, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 9

Project: Software Development Date: Thu 5/25/17

Developer

Developer

3/16

M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S Apr 9, ’00 Apr 16, ’00 Apr 23, ’00 Apr 30, ’00 May 7, ’00 May 14, ’00 May 21, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 10

Project: Software Development Date: Thu 5/25/17

Testers

Testers

Testers

Testers

Testers

4/6

Testers

Testers

Testers

Testers

4/24

Trainers

Trainers

Trainers

Trainers

4/19

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S Apr 9, ’00 Apr 16, ’00 Apr 23, ’00 Apr 30, ’00 May 7, ’00 May 14, ’00 May 21, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 11

Project: Software Development Date: Thu 5/25/17

3/29

Deployment Team

Deployment Team

Deployment Team

5/3

Deployment Team

Deployment Team

Deployment Team

Deployment Team

Deployment Team

5/10

Project Manager

Project Manager

Project Manager

5/15

5/15

M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S Apr 9, ’00 Apr 16, ’00 Apr 23, ’00 Apr 30, ’00 May 7, ’00 May 14, ’00 May 21, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 12

Project: Software Development Date: Thu 5/25/17

Applied Sciences
Architecture and Design
Biology
Business & Finance
Chemistry
Computer Science
Geography
Geology
Education
Engineering
English
Environmental science
Spanish
Government
History
Human Resource Management
Information Systems
Law
Literature
Mathematics
Nursing
Physics
Political Science
Psychology
Reading
Science
Social Science
Home
Homework Answers
Blog
Archive
Tags
Reviews
Contact
twitterfacebook
Copyright © 2022 SweetStudy.comSWEETSTUDY.COM – YOUR HOMEWORK ANSWERS
chat0
Home.Literature.
Help.
Log in / Sign up
Please see the attachments for the work.
profile
lee3

SoftwareDevelopmentPlan.pdf
Home>Computer Science homework help>Please see the attachments for the work.
ID Task Name Duration Start Finish Predecessors

1 Scope 3.5 days Mon 1/3/00 Thu 1/6/00

2 Determine project scope 4 hrs Mon 1/3/00 Mon 1/3/00

3 Secure project sponsorship 1 day Mon 1/3/00 Tue 1/4/00 2

4 Define preliminary resources 1 day Tue 1/4/00 Wed 1/5/00 3

5 Secure core resources 1 day Wed 1/5/00 Thu 1/6/00 4

6 Scope complete 0 days Thu 1/6/00 Thu 1/6/00 5

7 Analysis/Software Requirements

14 days Thu 1/6/00 Wed 1/26/00

8 Conduct needs analysis 5 days Thu 1/6/00 Thu 1/13/00 6

9 Draft preliminary software specifications3 days Thu 1/13/00 Tue 1/18/00 8

10 Develop preliminary budget 2 days Tue 1/18/00 Thu 1/20/00 9

11 Review software specifications/budget with team4 hrs Thu 1/20/00 Thu 1/20/00 10

12 Incorporate feedback on software specifications1 day Fri 1/21/00 Fri 1/21/00 11

13 Develop delivery timeline 1 day Mon 1/24/00 Mon 1/24/00 12

14 Obtain approvals to proceed (concept, timeline, budget)4 hrs Tue 1/25/00 Tue 1/25/00 13

15 Secure required resources 1 day Tue 1/25/00 Wed 1/26/00 14

16 Analysis complete 0 days Wed 1/26/00 Wed 1/26/00 15

17 Design 14.5 days Wed 1/26/00 Tue 2/15/00

18 Review preliminary software specifications2 days Wed 1/26/00 Fri 1/28/00 16

19 Develop functional specifications 5 days Fri 1/28/00 Fri 2/4/00 18

20 Develop prototype based on functional specifications4 days Fri 2/4/00 Thu 2/10/00 19

21 Review functional specifications 2 days Thu 2/10/00 Mon 2/14/00 20

22 Incorporate feedback into functional specifications1 day Mon 2/14/00 Tue 2/15/00 21

23 Obtain approval to proceed 4 hrs Tue 2/15/00 Tue 2/15/00 22

24 Design complete 0 days Tue 2/15/00 Tue 2/15/00 23

25 Development 21.75 days Wed 2/16/00 Thu 3/16/00

26 Review functional specifications 1 day Wed 2/16/00 Wed 2/16/00 24

27 Identify modular/tiered design parameters1 day Thu 2/17/00 Thu 2/17/00 26

28 Assign development staff 1 day Fri 2/18/00 Fri 2/18/00 27

29 Develop code 15 days Mon 2/21/00 Fri 3/10/00 28

30 Developer testing (primary debugging)15 days Thu 2/24/00 Thu 3/16/00 29FS-75%

31 Development complete 0 days Thu 3/16/00 Thu 3/16/00 30

32 Testing 48.75 days Wed 2/16/00 Mon 4/24/00

Management

Management

Project Manager

Project Manager

1/6

Analyst

Analyst

Project Manager

Project Manager,Analyst

Analyst

Project Manager

Management,Project Manager

Project Manager

1/26

Analyst

Analyst

Analyst

S M T W T F S S M T W T F S S M T W Jan 2, ’00 Jan 9, ’00 Jan 16, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 1

Project: Software Development Date: Thu 5/25/17

ID Task Name Duration Start Finish Predecessors

33 Develop unit test plans using product specifications4 days Wed 2/16/00 Mon 2/21/00 24

34 Develop integration test plans using product specifications4 days Wed 2/16/00 Mon 2/21/00 24

35 Unit Testing 15 days Thu 3/16/00 Thu 4/6/00

36 Review modular code 5 days Thu 3/16/00 Thu 3/23/00 33,31

37 Test component modules to product specifications2 days Thu 3/23/00 Mon 3/27/00 31,36

38 Identify anomalies to product specifications3 days Mon 3/27/00 Thu 3/30/00 37

39 Modify code 3 days Thu 3/30/00 Tue 4/4/00 38

40 Re-test modified code 2 days Tue 4/4/00 Thu 4/6/00 39

41 Unit testing complete 0 days Thu 4/6/00 Thu 4/6/00 40

42 Integration Testing 12 days Thu 4/6/00 Mon 4/24/00

43 Test module integration 5 days Thu 4/6/00 Thu 4/13/00 41

44 Identify anomalies to specifications 2 days Thu 4/13/00 Mon 4/17/00 43

45 Modify code 3 days Mon 4/17/00 Thu 4/20/00 44

46 Re-test modified code 2 days Thu 4/20/00 Mon 4/24/00 45

47 Integration testing complete 0 days Mon 4/24/00 Mon 4/24/00 46

48 Training 45.75 days Wed 2/16/00 Wed 4/19/00

49 Develop training specifications for end users3 days Wed 2/16/00 Fri 2/18/00 24

50 Develop training specifications for helpdesk support staff3 days Wed 2/16/00 Fri 2/18/00 24

51 Identify training delivery methodology (computer based training, classroom, etc.)2 days Wed 2/16/00 Thu 2/17/00 24

52 Develop training materials 3 wks Thu 3/16/00 Thu 4/6/00 49,31,50,51

53 Conduct training usability study 4 days Thu 4/6/00 Wed 4/12/00 52

54 Finalize training materials 3 days Wed 4/12/00 Mon 4/17/00 53

55 Develop training delivery mechanism 2 days Mon 4/17/00 Wed 4/19/00 54

56 Training materials complete 0 days Wed 4/19/00 Wed 4/19/00 55

57 Documentation 30.5 days Wed 2/16/00 Wed 3/29/00

58 Develop Help specification 1 day Wed 2/16/00 Wed 2/16/00 24

59 Develop Help system 3 wks Wed 3/1/00 Wed 3/22/00 58,29FS-50%

60 Review Help documentation 3 days Wed 3/22/00 Mon 3/27/00 59

61 Incorporate Help documentation feedback2 days Mon 3/27/00 Wed 3/29/00 60

62 Develop user manuals specifications 2 days Wed 2/16/00 Thu 2/17/00 24

63 Develop user manuals 3 wks Wed 3/1/00 Wed 3/22/00 62,29FS-50%

64 Review all user documentation 2 days Wed 3/22/00 Fri 3/24/00 63

65 Incorporate user documentation feedback2 days Fri 3/24/00 Tue 3/28/00 64

S M T W T F S S M T W T F S S M T W Jan 2, ’00 Jan 9, ’00 Jan 16, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 2

Project: Software Development Date: Thu 5/25/17

ID Task Name Duration Start Finish Predecessors

66 Documentation complete 0 days Wed 3/29/00 Wed 3/29/00 65,61

67 Pilot 70.25 days Wed 1/26/00 Wed 5/3/00

68 Identify test group 1 day Wed 1/26/00 Thu 1/27/00 16

69 Develop software delivery mechanism 1 day Thu 1/27/00 Fri 1/28/00 68

70 Install/deploy software 1 day Mon 4/24/00 Tue 4/25/00 47,69,66,56

71 Obtain user feedback 1 wk Tue 4/25/00 Tue 5/2/00 70

72 Evaluate testing information 1 day Tue 5/2/00 Wed 5/3/00 71

73 Pilot complete 0 days Wed 5/3/00 Wed 5/3/00 72

74 Deployment 5 days Wed 5/3/00 Wed 5/10/00

75 Determine final deployment strategy 1 day Wed 5/3/00 Thu 5/4/00 73

76 Develop deployment methodology 1 day Thu 5/4/00 Fri 5/5/00 75

77 Secure deployment resources 1 day Fri 5/5/00 Mon 5/8/00 76

78 Train support staff 1 day Mon 5/8/00 Tue 5/9/00 77

79 Deploy software 1 day Tue 5/9/00 Wed 5/10/00 78

80 Deployment complete 0 days Wed 5/10/00 Wed 5/10/00 79

81 Post Implementation Review 3 days Wed 5/10/00 Mon 5/15/00

82 Document lessons learned 1 day Wed 5/10/00 Thu 5/11/00 80

83 Distribute to team members 1 day Thu 5/11/00 Fri 5/12/00 82

84 Create software maintenance team 1 day Fri 5/12/00 Mon 5/15/00 83

85 Post implementation review complete 0 days Mon 5/15/00 Mon 5/15/00 84

86 Software development template complete 0 days Mon 5/15/00 Mon 5/15/00 85

Project Manager

S M T W T F S S M T W T F S S M T W Jan 2, ’00 Jan 9, ’00 Jan 16, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 3

Project: Software Development Date: Thu 5/25/17

Management

Management

Project Manager

Project Manager

1/6

Analyst

Analyst

Project Manager

Project Manager,Analyst

Analyst

Project Manager

Management,Project Manager

Project Manager

1/26

Analyst

Analyst

Analyst

Management

Management

Management,Project Manager

2/15

Developer

Developer

Developer

Developer

Developer

3/16

W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T Jan 16, ’00 Jan 23, ’00 Jan 30, ’00 Feb 6, ’00 Feb 13, ’00 Feb 20, ’00 Feb 27, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 4

Project: Software Development Date: Thu 5/25/17

Testers

Testers

Testers

Testers

Testers

Testers

Testers

4/6

Testers

Trainers

Trainers

Trainers

Trainers

Trainers

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T Jan 16, ’00 Jan 23, ’00 Jan 30, ’00 Feb 6, ’00 Feb 13, ’00 Feb 20, ’00 Feb 27, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 5

Project: Software Development Date: Thu 5/25/17

3/29

Project Manager

W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T Jan 16, ’00 Jan 23, ’00 Jan 30, ’00 Feb 6, ’00 Feb 13, ’00 Feb 20, ’00 Feb 27, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 6

Project: Software Development Date: Thu 5/25/17

Project Manager

Project Manager,Analyst

Analyst

Project Manager

Management,Project Manager

Project Manager

1/26

Analyst

Analyst

Analyst

Management

Management

Management,Project Manager

2/15

Developer

Developer

Developer

Developer

Developer

3/16

T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M Feb 27, ’00 Mar 5, ’00 Mar 12, ’00 Mar 19, ’00 Mar 26, ’00 Apr 2, ’00 Apr 9, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 7

Project: Software Development Date: Thu 5/25/17

Testers

Testers

Testers

Testers

Testers

Testers

Testers

4/6

Testers

Testers

Testers

Testers

4/24

Trainers

Trainers

Trainers

Trainers

Trainers

Trainers

Trainers

4/19

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M Feb 27, ’00 Mar 5, ’00 Mar 12, ’00 Mar 19, ’00 Mar 26, ’00 Apr 2, ’00 Apr 9, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 8

Project: Software Development Date: Thu 5/25/17

3/29

Project Manager

Deployment Team

Deployment Team

Deployment Team

5/3

Deployment Team

Deployment Team

Deployment Team

Deployment Team

Deployment Team

5/10

Project Manager

Project Manager

Project Manager

5/15

5/15

T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M Feb 27, ’00 Mar 5, ’00 Mar 12, ’00 Mar 19, ’00 Mar 26, ’00 Apr 2, ’00 Apr 9, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 9

Project: Software Development Date: Thu 5/25/17

Developer

Developer

3/16

M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S Apr 9, ’00 Apr 16, ’00 Apr 23, ’00 Apr 30, ’00 May 7, ’00 May 14, ’00 May 21, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 10

Project: Software Development Date: Thu 5/25/17

Testers

Testers

Testers

Testers

Testers

4/6

Testers

Testers

Testers

Testers

4/24

Trainers

Trainers

Trainers

Trainers

4/19

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

Technical Communicators

M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S Apr 9, ’00 Apr 16, ’00 Apr 23, ’00 Apr 30, ’00 May 7, ’00 May 14, ’00 May 21, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 11

Project: Software Development Date: Thu 5/25/17

3/29

Deployment Team

Deployment Team

Deployment Team

5/3

Deployment Team

Deployment Team

Deployment Team

Deployment Team

Deployment Team

5/10

Project Manager

Project Manager

Project Manager

5/15

5/15

M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S Apr 9, ’00 Apr 16, ’00 Apr 23, ’00 Apr 30, ’00 May 7, ’00 May 14, ’00 May 21, ’00

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Progress

Deadline

Page 12

Project: Software Development Date: Thu 5/25/17

Applied Sciences
Architecture and Design
Biology
Business & Finance
Chemistry
Computer Science
Geography
Geology
Education
Engineering
English
Environmental science
Spanish
Government
History
Human Resource Management
Information Systems
Law
Literature
Mathematics
Nursing
Physics
Political Science
Psychology
Reading
Science
Social Science
Home
Homework Answers
Blog
Archive
Tags
Reviews
Contact
twitterfacebook
Copyright © 2022 SweetStudy.com

Order Solution Now

Our Service Charter

1. Professional & Expert Writers: Blackboard Experts only hires the best. Our writers are specially selected and recruited, after which they undergo further training to perfect their skills for specialization purposes. Moreover, our writers are holders of masters and Ph.D. degrees. They have impressive academic records, besides being native English speakers.

2. Top Quality Papers: Our customers are always guaranteed of papers that exceed their expectations. All our writers have +5 years of experience. This implies that all papers are written by individuals who are experts in their fields. In addition, the quality team reviews all the papers before sending them to the customers.

3. Plagiarism-Free Papers: All papers provided by Blackboard Experts are written from scratch. Appropriate referencing and citation of key information are followed. Plagiarism checkers are used by the Quality assurance team and our editors just to double-check that there are no instances of plagiarism.

4. Timely Delivery: Time wasted is equivalent to a failed dedication and commitment. Blackboard Experts is known for timely delivery of any pending customer orders. Customers are well informed of the progress of their papers to ensure they keep track of what the writer is providing before the final draft is sent for grading.

5. Affordable Prices: Our prices are fairly structured to fit in all groups. Any customer willing to place their assignments with us can do so at very affordable prices. In addition, our customers enjoy regular discounts and bonuses.

6. 24/7 Customer Support: At Blackboard Experts, we have put in place a team of experts who answer to all customer inquiries promptly. The best part is the ever-availability of the team. Customers can make inquiries anytime.